少妇无码太爽了视频在线播放,h动画在线看,一区二区三区无码高清视频,а√最新版资源在线官网

Add to Favorite | Set Home | Casual look | Mobile
1

Henan Lontto Machinery Co., Ltd.

  • <kbd id="e4aqc"></kbd>
  • <tr id="e4aqc"></tr>
  • Company Profile
    news
    • No news
     Verified Company

     Henan Lontto Machinery Co., Ltd.

    China

    category
    • No Category
    Site Search
     
    link
    • No Links
    Current:Home » Product Categories » » LMR1000 Coal Pulverizer Burner
    Similar products
    LMR1000 Coal Pulverizer Burner
    Click to enlarge
    Product:
    Brand: aa 
    Price: 50000.00USD/ 
    MOQ: 1  
    Total supply:
    Delivery time: From the date of payment from the buyer within days of delivery
    update time: 2023-11-14 01:00  Valid to:Long-term effective
      Inquiry
    Profile

    LMR1000 asphalt plant Coal Burner 

    LMR pulverized coal burner with a specially designed multi-stage air-driven structure to speak out of turn, can produce in a short time so that high-temperature pulverized coal swirl with burning completely, heat utilization high, smoke dust, efficient energy saving, improvement of working conditions, reducing labor intensity, etc., LMR coal burners are ideal for energy saving and environmental protection products.

     

     

     

    Features of LMR Model Pulverized Coal Burner

                             

    LMR Pulverized Coal Burner is the New generation heating equipment, developed by Lontto Company, the features in the following:

    1. The Coal burner adopt new structure, change the traditional mechanism of coal burner, adopt the rotating type of combustor, to solve the problem of coal burner slag-bonding. 

    2.Flame temperature is high, energy saving, sufficient burning.

    3.Adopt the high-performance refractory brick of exclusive batching, to increase of service life.

    4.Continuous production, need not slag remove every day.

    5.Low cost of production, one-third of fuel oil burner.

     

     

    Model

    Power (KW)

    Coal Consumption (KG/H)

    Asphalt Plant Capacity (T/H)

    Mixture Temperature Control

    (°C)

    LMR500

    31.25

    450

    25-40

    130-180

    LMR1000

    41.25

    1000

    70-85

    LMR1500

    73.75

    1500

    100-125

    LMR2000

    97.25

    2000

    140-170

    LMR3000

    138.45

    2860

    200-250

    LMR4000

    202.45

    3660

    280-320

     

     

     

     

    Requirements of the Coal

     

    1. Igniting Oil: 0# Diesel Oil
    2. Requirements of the Coal: Bituminous Coal

                (1)    Calorific Power > 25KJ

                (2)    Volatile Content 25%

                (3)    Ash Content 8-10%

                (4)    Moisture 3-4%

                (5)    Sulfur Content 1%

                (6)    Granularity 20mm

     

    The Cost Comparison between Oil Burner and Coal Burner

    For example: one 160TPH Asphalt mixing plant is operated 10 hours everyday.

    Oil burner

    Diesel Oil Consumption: 7*160*10=11200 (kg/day)

    Electricity Consumption: 30*10=300 (kw.H/day)

    Total cost (RMB): 6*11200+0.8*300=67440 (RMB), as well as 991 USD

     

    Coal burner for asphalt mxing plant

    Bituminous coal consumption: 2*160*10=19200 (kg/day)

    Electricity consumption: 98*10=980 (kw.H/day)

    Four labors salary: 4*10*8.5=185 (RMB/day)

    Total cost (RMB): 19200*0.8+980*0.8+180=16324 (RMB), as well as 2400 USD

    The Coal Burner will save fuel cost everyday than the Oil Burner:

    67440-16324=51116 (RMB), as well as 7518 USD

     

     Notes                                                                        

    · When the new combustion chamber of pulverized coal burner first using, the temperature should be increase to operating temperature slowly.

     · When removing slag, check the slag-bonding of spray fire port, if not affect use, need not clean. If it must be clean, the slag should be levered slowly, it must not beat violently by hammer, in order to avoid the slag damage bottom brick body.

     · Try your best to avoid start the coal burner frequently.

    · Note to check every part has or not abrade and damaged by fire. Make sure the machines have not hidden danger, and prohibit to operate when operator have ill.  

     · If the machine is not use in long-term. It should be moisture protection, rain-proof. 

    · Anybody not allow change the PLC electrical equipment, line. and connecting the electric wire without permission in the PLC, 

     · Host machine of coal burner must have ground wire reliable. (40mm×40mm angle steel under the moist ground 1000mm.  )

      asphalt plant Coal Burner

    Website: www.lontto.com

     

    Inquiry list
    Related Products
     
    主站蜘蛛池模板: 依兰县| 榆社县| 彭水| 赞皇县| 宜兰县| 平南县| 河南省| 长子县| 沿河| 葫芦岛市| 深泽县| 兰溪市| 南部县| 栖霞市| 乡城县| 信阳市| 平邑县| 漠河县| 长白| 定远县| 辉南县| 铜山县| 通化市| 平潭县| 松滋市| 来宾市| 龙陵县| 门源| 襄汾县| 诸暨市| 莆田市| 闸北区| 建湖县| 修水县| 连城县| 东乡县| 平湖市| 嘉兴市| 读书| 稷山县| 敦化市|
  • <tfoot id="e4aqc"><source id="e4aqc"></source></tfoot>