少妇无码太爽了视频在线播放,h动画在线看,一区二区三区无码高清视频,а√最新版资源在线官网

Add to Favorite | Set Home | Casual look | Mobile
1

Henan Lontto Machinery Co., Ltd.

    <legend id="6k85m"></legend>

  • <cite id="6k85m"></cite>
      Company Profile
      news
      • No news
       Verified Company

       Henan Lontto Machinery Co., Ltd.

      China

      category
      • No Category
      Site Search
       
      link
      • No Links
      Current:Home » Product Categories » » LMR4000 how do we get dry coal
      Similar products
      LMR4000 how do we get dry coal
      Click to enlarge
      Product:
      Brand: aa 
      Price: 50000.00USD/ 
      MOQ: 1  
      Total supply:
      Delivery time: From the date of payment from the buyer within days of delivery
      update time: 2023-04-11 01:00  Valid to:Long-term effective
        Inquiry
      Profile

      LMR4000 asphalt plant Coal Burner 

      LMR pulverized coal burner with a specially designed multi-stage air-driven structure to speak out of turn, can produce in a short time so that high-temperature pulverized coal swirl with burning completely, heat utilization high, smoke dust, efficient energy saving, improvement of working conditions, reducing labor intensity, etc., LMR coal burners are ideal for energy saving and environmental protection products.

       

       

       

      Features of LMR Model Pulverized Coal Burner

                               

      LMR Pulverized Coal Burner is the New generation heating equipment, developed by Lontto Company, the features in the following:

      1. The Coal burner adopt new structure, change the traditional mechanism of coal burner, adopt the rotating type of combustor, to solve the problem of coal burner slag-bonding. 

      2.Flame temperature is high, energy saving, sufficient burning.

      3.Adopt the high-performance refractory brick of exclusive batching, to increase of service life.

      4.Continuous production, need not slag remove every day.

      5.Low cost of production, one-third of fuel oil burner.

       

       

      Model

      Power (KW)

      Coal Consumption (KG/H)

      Asphalt Plant Capacity (T/H)

      Mixture Temperature Control

      (°C)

      LMR500

      31.25

      450

      25-40

      130-180

      LMR1000

      41.25

      1000

      70-85

      LMR1500

      73.75

      1500

      100-125

      LMR2000

      97.25

      2000

      140-170

      LMR3000

      138.45

      2860

      200-250

      LMR4000

      202.45

      3660

      280-320

       

       

       

       

      Requirements of the Coal

       

      1. Igniting Oil: 0# Diesel Oil
      2. Requirements of the Coal: Bituminous Coal

                  (1)    Calorific Power > 25KJ

                  (2)    Volatile Content 25%

                  (3)    Ash Content 8-10%

                  (4)    Moisture 3-4%

                  (5)    Sulfur Content 1%

                  (6)    Granularity 20mm

       

      The Cost Comparison between Oil Burner and Coal Burner

      For example: one 160TPH Asphalt mixing plant is operated 10 hours everyday.

      Oil burner

      Diesel Oil Consumption: 7*160*10=11200 (kg/day)

      Electricity Consumption: 30*10=300 (kw.H/day)

      Total cost (RMB): 6*11200+0.8*300=67440 (RMB), as well as 991 USD

       

      Coal burner for asphalt mxing plant

      Bituminous coal consumption: 2*160*10=19200 (kg/day)

      Electricity consumption: 98*10=980 (kw.H/day)

      Four labors salary: 4*10*8.5=185 (RMB/day)

      Total cost (RMB): 19200*0.8+980*0.8+180=16324 (RMB), as well as 2400 USD

      The Coal Burner will save fuel cost everyday than the Oil Burner:

      67440-16324=51116 (RMB), as well as 7518 USD

       

       Notes                                                                        

      · When the new combustion chamber of pulverized coal burner first using, the temperature should be increase to operating temperature slowly.

       · When removing slag, check the slag-bonding of spray fire port, if not affect use, need not clean. If it must be clean, the slag should be levered slowly, it must not beat violently by hammer, in order to avoid the slag damage bottom brick body.

       · Try your best to avoid start the coal burner frequently.

      · Note to check every part has or not abrade and damaged by fire. Make sure the machines have not hidden danger, and prohibit to operate when operator have ill.  

       · If the machine is not use in long-term. It should be moisture protection, rain-proof. 

      · Anybody not allow change the PLC electrical equipment, line. and connecting the electric wire without permission in the PLC, 

       · Host machine of coal burner must have ground wire reliable. (40mm×40mm angle steel under the moist ground 1000mm.  )

        asphalt plant Coal Burner

      Website: www.lontto.com

       

      Inquiry list
      Related Products
       
      主站蜘蛛池模板: 达日县| 绥宁县| 营山县| 石景山区| 上蔡县| 奉贤区| 江阴市| 丁青县| 鲁山县| 甘肃省| 加查县| 威宁| 龙山县| 东丽区| 仪征市| 广安市| 太仆寺旗| 金沙县| 安徽省| 禄丰县| 新昌县| 子长县| 铁岭县| 兴国县| 弥勒县| 开鲁县| 灌南县| 禹城市| 新丰县| 万源市| 自贡市| 开鲁县| 安泽县| 南通市| 江西省| 开原市| 英超| 沁源县| 沧州市| 循化| 邮箱|